For businesses and buildings

Chargers for businesses and buildings — with metering and statements

We install chargers for hotels, garages and car parks, new builds, apartment buildings and company cars, with a MID meter at every spot and load management, and the quote comes with a technical description of the works. A charging spot costs 39.000 or 104.000 RSD incl. VAT, with basic installation next to the distribution board, and the calculator gives a rough price for the whole property.

Apartment building garage with wall-mounted chargers and electric cars
MID meter
at every spot, electricity with no markup
Who it’s for

Seven types of clients, one approach

The basics are the same everywhere: a MID meter at every spot, load management and monthly statements. What differs is the number of spots and who pays for the electricity.

A guest’s electric car charging at a wall charger outside a hotel

Hotels and vacation rentals

Guests charge overnight at 11 kW, and the MID meter shows what each spot costs you at the price on your electricity bill.

Chargers for hotels
A row of wall chargers in a business garage

Garages and parking lots

For garage operators, business centers and owners of rental garages: each user pays for electricity by their own meter.

Chargers for garages and parking lots
A guarded car park with a barrier, an attendant booth and chargers on pedestals

Guarded and long-stay car parks

Car parks with a barrier near airports, stations and in city centers: cars charge while parked, and a MID meter records each spot’s usage.

Chargers for car parks
A new garage with junction boxes at the parking spaces and the first charger

New builds and developers

We run a cable route and install a junction box at every space while the building is under construction. Apartment buyers order a charger later, at the kit price.

Chargers for new builds
An electrician installing a wall charger in an apartment building garage

Apartment buildings and building managers

We provide templates for the residents’ assembly and handle statements by MID meter. Only residents who join pay, and it costs the building nothing.

Chargers for apartment buildings
A car showroom with an electric car and a wall charger

Car dealerships

Buyers who live in apartment buildings ask where they’ll charge before they even buy. We contact the buyers you refer to us within 48 hours.

Chargers for car dealerships
Company electric cars charging in the company car park

Businesses and company cars

Company cars charge at the employee’s home or in the company parking lot, and with a subscription you get a monthly statement for each spot.

Chargers for company cars
=

Calculate an estimated price for your property

The calculator adds up the charging spots and the shared infrastructure for your property, incl. VAT. You get the exact price in the quote after the site assessment.

Open the calculator
A wall charger and an enclosure with a MID meter
Service

What you get with the charger

✓

MID meter at every spot

A certified meter measures each spot’s consumption. Everyone pays for what they used, at the price on the bill, with no markup.

✓

Load management

Chargers draw only the power that’s available and don’t interfere with other consumption, so an increase in approved power often isn’t needed.

✓

Documents and permits

At the assessment we tell you exactly what applies to your property; we provide the technical description of the works and the as-built documentation, and the property owner obtains the approval, if one is needed. For apartment buildings we also provide templates for the residents’ assembly.

✓

Licensed electricians

Licensed electricians install to our standard, and a licensed company inspects the shared infrastructure.

✓

Monthly statement in PDF and CSV

With a subscription, you get a statement for every spot each month — for your accounting or for cost pass-through (re-invoicing). Statements are also available in your Moj Evolako account.

✓

Expandable later

You can prepare spaces in advance with a cable route and junction box, and add chargers as demand grows.

Pricing

The price is made up of four parts

The price of a spot equals the kit price, and the shared infrastructure depends on the property.

Charging spot
39.000 / 104.000 RSD
reinforced socket or 11 kW wallbox, with a MID meter, incl. VAT; basic installation next to the distribution board: up to 2 m of cable, RCD protection and breaker
Shared infrastructure
depends on the property
sub-panel with load management, cable route, design and inspection; not needed for 1–2 spots next to the distribution board
Grid connection or power increase
per the EDS (grid operator) price list
only if needed; you file the request with EDS, and we list the cost as a separate line item with no markup
Subscription per spot
990 RSD per month
incl. VAT, optional; first 2 months 0 RSD, no contract lock-in
Hotel, 4 wallbox spots in the garage, distribution board 10–30 m away
4 × 11 kW wallbox with MID meter: 416.000 RSD
Shared infrastructure: 240.000–456.000 RSD
About 164.000–218.000 RSD per spot
Total: about 656.000–872.000 RSD incl. VAT
Garage or parking lot, 10 wallbox spots, distribution board 30–60 m away
10 × 11 kW wallbox with MID meter: 1.040.000 RSD
Shared infrastructure: 418.000–833.000 RSD
About 145.000–188.000 RSD per spot
Total: about 1.458.000–1.873.000 RSD incl. VAT
Apartment building, 10 participants, distribution board 10–30 m away
Garage with up to 30 spaces
Reinforced socket: 96.000–126.000 RSD per participant
11 kW wallbox: 145.000–191.000 RSD per participant
Per participant, incl. VAT — the building pays nothing
Not included
  • Power increase or new grid connection: you pay EDS, the grid operator, per its price list; you file the request, and we list the cost in the quote as a separate line item with no markup, so you know the total
  • Excavation and asphalt work outside the building
  • Fees of the authorities, where required — the property owner files the application; we provide the technical description of the works
  • Repairs to the existing wiring, if the site assessment finds it faulty
Process

From inquiry to monthly statement in five steps

01

Inquiry

Send us a few words about the property: the city, the number of spots and where the distribution board is. We’ll get back to you within 48 hours.

02

Agreeing by message and a rough estimate

Based on photos of the distribution board and the parking area, plus an electricity bill, we give you an estimated price.

03

On-site assessment

We check the distribution board, the approved power and the route to the parking spot. The assessment costs 2.990 RSD and is credited toward the installation.

04

Quote with exact price and timeline

The quote includes the price for each spot, the shared infrastructure and the timeline. If a power increase is needed, you file the request with EDS, and we list the cost per the EDS price list as a separate line item.

05

Installation and statements

Installing one spot takes one working day. After that, the MID meter measures each spot’s consumption, and with a subscription you get a monthly statement.

Live in an apartment building?

Submit your building’s address. Once five residents from the same address sign up, we assess the garage and prepare a quote for the whole building.

An apartment building in Novi Sad at dusk, with the garage entrance
Questions

FAQ

Do you sell electricity?

No. You pay your electricity supplier on your own bill, and the MID meter measures each spot’s consumption. Statements use the price on your bill, with no markup.

Do we need to increase the power of our grid connection?

Often not, because load management distributes the existing power across all the chargers. If an increase is needed after all, you file the request with EDS, the grid operator, and pay per its price list; we list the cost in the quote as a separate line item with no markup, so you know the total.

Is the subscription mandatory?

No. The kit works without it, and the 2-year warranty applies either way. The subscription gives you a monthly statement for each spot in PDF and CSV, a reply within 48 hours, priority service and an annual check of the installation and equipment.

Do you also install 22 kW or DC chargers?

On request. For overnight charging and charging during the workday, 11 kW is enough; 22 kW makes sense where a car stays for 1–3 hours and can itself accept 22 kW. A DC charger is a separate project with a new grid connection.

How long does installation take?

One working day per spot. In an apartment building, including the residents’ assembly decision, the whole process takes 4–10 weeks; for larger properties, we put the timeline in the quote.

Where do you work?

In Belgrade and its surroundings, Novi Sad and Vojvodina. We speak Serbian, Russian and English.

Inquiry

Request a quote

Leave your contact details and a few words about the property — we’ll get back to you within 48 hours with a rough estimate and a proposal for an on-site assessment.

Enter your name.
Check the number — e.g. +381 60 123 45 67.
Enter your city.
Without your consent we can't contact you.
Send request
No spam and no selling of data — we only get in touch about your request.
Thanks! Your request is in — we'll reply within 48h.
Something went wrong. Please try again — or write to us at hello@evolako.com.
Message us wherever suits you
hello@evolako.comCopy addressCopied ✓

💬 +381 65 381 6083 · messages only, no calls

🕗 Every day · reply within 48h

🌍 We speak Serbian, English and Russian.

Where we work: Belgrade and surroundings · Novi Sad · Vojvodina. For properties in other cities, leave your contact details — we agree case by case.

Home charging for apartment residents — installation, MID meter and billing down to the dinar.

The iPhone and Android app is coming soon.
Let me know when it’s out →

Follow us
hello@evolako.comCopy addressCopied ✓