What an EV charger costs for a building, hotel or business

A spot with a reinforced socket costs 39.000 RSD, and one with an 11 kW wallbox costs 104.000 RSD — both with a MID-certified meter, incl. VAT and basic installation next to the distribution board. The calculator adds the shared infrastructure for your property and shows an estimated range.

An electrician assessing the distribution board and the garage
2.990 RSD
on-site assessment, credited toward the installation
How we calculate

The price has four parts

The calculator adds up the price of the spots and the shared infrastructure. In an apartment building, the participants split the cost of the line; in a new build, the price is calculated per prepared space.

01

Charging spot

The price of a spot is the kit price: 39.000 RSD for a reinforced socket or 104.000 RSD for an 11 kW wallbox, both with a MID meter, incl. VAT. Basic installation next to the distribution board is included: up to 2 m of cable, RCD protection and a breaker.

02

Shared infrastructure

A sub-panel with surge protection and load management, a cable route from the distribution board, a line with junction boxes along the spaces if needed, the design and the installation inspection. Not needed for 1–2 spots next to the distribution board.

03

EDS grid connection

If the property doesn’t have enough power, you file the request for an increase or new connection with EDS, the grid operator, and we list the cost per its price list as a separate line item with no markup from us. Load management often makes this unnecessary.

04

Subscription per spot

990 RSD per month incl. VAT, first 2 months 0 RSD, no contract lock-in. It includes a monthly statement based on the MID meter (PDF and CSV), a reply within 48 hours, priority service and an annual check of the installation and equipment; the kit works without it too.

Note

What’s not included

The estimate covers the charging spots, installation and shared infrastructure. The following items depend on the property and, when needed, are listed separately in the quote:

  • Power increase or new grid connection: you pay EDS, the grid operator, per its price list; you file the request, and we list the cost in the quote as a separate line item with no markup, so you know the total
  • Excavation and asphalt work outside the building
  • Fees of the authorities, where required — the property owner files the application; we provide the technical description of the works
  • Repairs to the existing wiring, if the site assessment finds it faulty
Examples

Four examples from the calculator

The examples are estimated prices from this calculator, incl. VAT; for the hotel, garage and new build, the amount excluding VAT is shown too.

Hotel, 4 wallbox spots in the garage, distribution board 10–30 m away
4 × 11 kW wallbox with MID meter: 416.000 RSD
Shared infrastructure: 240.000–456.000 RSD
About 164.000–218.000 RSD per spot
Excl. VAT: 546.000–727.000 RSD
Total: about 656.000–872.000 RSD incl. VAT
Garage or parking lot, 10 wallbox spots, distribution board 30–60 m away
10 × 11 kW wallbox with MID meter: 1.040.000 RSD
Shared infrastructure: 418.000–833.000 RSD
About 145.000–188.000 RSD per spot
Excl. VAT: 1.215.000–1.561.000 RSD
Total: about 1.458.000–1.873.000 RSD incl. VAT
Apartment building, 10 participants, distribution board 10–30 m away
Garage with up to 30 spaces
Whole project, 10 sockets: 960.000–1.260.000 RSD
Reinforced socket: 96.000–126.000 RSD per participant
11 kW wallbox: 145.000–191.000 RSD per participant
Per participant, incl. VAT — the building pays nothing
New build, 40 spaces, 4 chargers in the first phase, distribution board 10–30 m away
All 40 spaces prepared: a cable route and junction box at each
4 × 11 kW wallbox with MID meter: 416.000 RSD
Space preparation and shared infrastructure: 801.000–1.178.000 RSD
About 20.000–30.000 RSD per prepared space
Excl. VAT: 1.014.000–1.329.000 RSD
Total: about 1.217.000–1.594.000 RSD incl. VAT
Not included
  • EDS grid connection or power increase, excavation and asphalt work, authority fees and repairs to the existing wiring
Questions

Common questions about the estimate

How accurate is the estimate?

The calculation is an estimate: it uses kit prices and typical infrastructure costs for the data you entered. The exact price comes in the quote after an on-site assessment, which costs 2.990 RSD and is credited toward the installation.

Why is the price given as a range?

The price of a spot is fixed, but the cost of the shared infrastructure depends on the length and path of the cable route, which only become clear on site. The lower end applies to shorter routes, the upper end to longer ones.

What is basic installation?

It’s the charger on the wall next to the existing distribution board, our sub-panel or a junction box on the line: up to 2 m of cable, RCD protection and a breaker. It’s included in the kit price. A longer cable to the spot, cable ducts, a wall passage or a new board are priced at the site assessment, before work starts.

Is VAT included?

All prices on this page include VAT. The calculator also shows the amount excluding VAT.

Why is the price per spot in a building lower when more of you join?

The participants pay for the shared line, so its cost is split among more people. With five participants, a socket spot costs about 99.000–159.000 RSD; with twenty, 96.000 RSD — the lowest price for a spot in the ZGRADA kit.

Inquiry

Request a quote

Your calculator estimate is sent with the inquiry, so you don’t need to copy anything. We’ll get back to you within 48 hours with a proposal for an on-site assessment.

Enter your name.
Check the number — e.g. +381 60 123 45 67.
Enter your city.
Without your consent we can't contact you.
Send request
No spam and no selling of data — we only get in touch about your request.
Thanks! Your request is in — we'll reply within 48h.
Something went wrong. Please try again — or write to us at hello@evolako.com.
Message us wherever suits you
hello@evolako.comCopy addressCopied ✓

💬 +381 65 381 6083 · messages only, no calls

🕗 Every day · reply within 48h

🌍 We speak Serbian, English and Russian.

Where we work: Belgrade and surroundings · Novi Sad · Vojvodina. For properties in other cities, leave your contact details — we agree case by case.

Home charging for apartment residents — installation, MID meter and billing down to the dinar.

The iPhone and Android app is coming soon.
Let me know when it’s out →

Follow us
hello@evolako.comCopy addressCopied ✓