Guide for businesses and buildings

Charger price per parking space: what’s included for a building, hotel or business

The price of one charging spot is made up of the kit for that spot, a share of the property’s shared infrastructure and, only when needed, a power increase from EDS, the grid operator. The kit with basic installation next to the distribution board costs 39.000 or 104.000 RSD incl. VAT; the shared part depends on the distance to the distribution board, the number of spots and the type of property.

Updated: October 8, 2026
Parking spaces with two chargers and boxes for future chargers

A charging spot costs the same as the kit with installation

You can rerun the examples in this guide with your own property’s details in the charger price calculator.

The basic unit is the charging spot, and it costs the same as the kit with a MID-certified meter and basic installation:

  • reinforced socket with a MID meter — 39.000 RSD incl. VAT: 2.3–3.7 kW, up to about 180 km overnight;
  • 11 kW wallbox with a MID meter — 104.000 RSD incl. VAT: three-phase, with load management, fully charges an empty car overnight, 2-year warranty;
  • 22 kW and DC chargers — on request.

The socket suits long stays — residents, employees or a garage that’s rented out, for example. For charging overnight or during the workday, 11 kW is enough. A 22 kW charger makes sense where a car stays 1–3 hours and can itself accept 22 kW, while a DC charger is a separate project with a new grid connection.

Basic installation means the charger on the wall next to the existing distribution board, a new sub-panel or a junction box on the shared line: up to 2 m of cable, RCD protection and a breaker. A longer cable to the spot, cable ducts, a wall passage or modifications to the distribution board are priced separately. The amount is set at the site assessment and written into the quote before work starts.

The shared part is priced per property

For one or two spots next to the distribution board, no shared part is needed: a hotel with 2 such spots costs about 220.000–244.000 RSD. With more spots, or spots farther from the distribution board, infrastructure that serves all of them is added:

  • a sub-panel with surge protection, a main switch and load management;
  • a cable route from the distribution board to the charging spots;
  • if needed, a shared line along the spots, with a junction box at each one;
  • the design, documentation and an installation inspection by a licensed company;
  • in an apartment building, templates for the residents’ assembly also come with it.

This part depends on the distance to the distribution board and the layout of the spots, so the examples give it as a range. The lower end applies to shorter, simpler cable routes and the upper end to longer ones; the exact amount comes after the on-site assessment.

Power, subscription and site assessment are separate items

If the existing power isn’t enough, a power increase or new grid connection is paid to EDS under its price list and the methodology of AERS, the energy regulator. In the quote, this is a separate line item with no markup from us, and load management often makes an increase unnecessary.

The subscription costs 990 RSD per month per spot incl. VAT, with the first 2 months at 0 RSD and no contract lock-in. It includes a monthly MID meter statement in PDF and CSV format, for your accounting or for cost pass-through (re-invoicing) to users with no markup. It also covers a reply within 48 hours, priority service and an annual check of the installation and equipment — and the charger and meter work without a subscription as well.

An on-site assessment costs 2.990 RSD and is credited toward the installation. Before it, we reply to your inquiry with a rough estimate based on photos and the electricity bill.

Examples: hotel, garage, company and new build

The examples are rough estimates including VAT, for typical conditions and without a subscription. The calculator shows the amounts excluding VAT.

Property
Total incl. VAT
Per spot
Hotel, 4 wallboxes in the garage, distribution board 10–30 m away
656.000–872.000 RSD
about 164.000–218.000 RSD
Garage or parking lot, 10 wallboxes, distribution board 30–60 m away
1.458.000–1.873.000 RSD
about 145.000–188.000 RSD
Company, 5 employees charging at home, a wallbox at each address
520.000 RSD
104.000 RSD
New build, 40 prepared spaces and 4 wallboxes at handover
1.217.000–1.594.000 RSD
about 20.000–30.000 RSD per prepared space, excluding chargers

The hotel with 4 spots has a higher price per spot than the garage with 10, even though the garage’s distribution board is farther away. In the garage, the sub-panel, design and documentation are spread over more spots. The company has no shared part, because each charger goes in at an employee’s address, as a basic installation next to the distribution board.

If, along with the 10 chargers, another 20 spaces in the garage are prepared for later with a cable route and junction box, the price is about 1.848.000–2.233.000 RSD. A charger can later go in at any of those 20 spaces as a basic installation, at the kit price.

The subscription in these examples comes to 3.960 RSD per month for the hotel, 9.900 RSD for the garage and 4.950 RSD for the company — 990 RSD per spot. In a new build, it applies only to spots with a charger.

In an apartment building, the price per spot drops as more residents join

In an apartment building garage, only the residents who join pay for the shared line, so it costs the building nothing. Each participant covers the price of their own kit and their portion of the shared line. Example for a garage with up to 30 spaces and the distribution board 10–30 m away, price per participant incl. VAT:

Participants
Reinforced socket
11 kW wallbox
5
99.000–159.000 RSD
164.000–224.000 RSD
10
96.000–126.000 RSD
145.000–191.000 RSD
20
96.000 RSD
137.000–161.000 RSD

The shared part grows more slowly than the number of participants: for 5 participants it’s about 300.000–597.000 RSD, and for 20 participants about 668.000–1.130.000 RSD. Split among the participants, each one’s portion keeps getting smaller. Still, a spot in the ZGRADA kit never costs less than 96.000 RSD: in this example, that’s the price of a reinforced socket from 10 participants on.

Participants in the same garage each choose their own kit: a reinforced socket or a wallbox.

Anyone who joins later pays for their own spot and the connection to the existing line. How the process goes through the residents’ assembly is described on the page about chargers for apartment buildings.

What the price doesn’t include

The prices in the examples and the calculator don’t include:

  • a power increase or new grid connection from EDS, which is a separate line item per its price list;
  • excavation and asphalt work outside the building, for example for pedestals in an outdoor parking lot;
  • fees and the decision approving the works, where required: the property owner files the application, we provide the technical description of the works, and fees are paid at their actual amount;
  • repairs to the existing wiring, if the site assessment finds it faulty.

Example: a hotel with 6 spots in an outdoor parking lot, with pedestals and the distribution board 10–30 m away, costs about 1.079.000–1.350.000 RSD, excluding excavation and asphalt work.

Under the current rulebook on special types of works (Official Gazette RS 87/2023 and amendments), installing chargers requires a decision approving the works under Art. 145 of the Law on Planning and Construction. At the assessment we tell you exactly what applies to your property; we provide the technical description of the works and the as-built documentation, and the property owner obtains the approval, if one is needed.

Sources

This guide was written with the help of AI tools based on the sources listed and was last checked on September 30, 2026. If you spot an error or have newer data, let us know at hello@evolako.com — we publish corrections with a date.

Calculate an estimated price for your property

The calculator works out the price per spot for a building, hotel, garage, new build or business using the same rules as the examples above, incl. VAT. You get the exact price in the quote after the site assessment.

Open the calculator

Home charging for apartment residents — installation, MID meter and billing down to the dinar.

The iPhone and Android app is coming soon.
Let me know when it’s out →

Follow us
hello@evolako.comCopy addressCopied ✓