For businesses · Hotels and vacation rentals

EV charging for hotel and vacation rental guests

A guest who arrives in the evening and leaves in the morning only needs an 11 kW wallbox. We install chargers with a MID meter at every spot and load management, and the quote comes with a technical description of the works.

A guest’s electric car charging at a wall charger outside a hotel
11 kW
enough for a full battery overnight
104.000 RSD
a spot with a wallbox and MID meter, incl. VAT
MID meter
at every spot, so you know the electricity cost per spot
1 working day
to install one spot
Power

For overnight guests, 11 kW is enough

Guests park in the evening and leave after breakfast, and in that time an 11 kW wallbox fills even an empty battery. A fast DC charger isn’t needed here.

A 22 kW charger makes sense where cars stay 1–3 hours and can accept 22 kW themselves. Pricing for 22 kW and DC is available on request.

A charger is also a reason for guests to choose your hotel: booking sites have a filter for places to stay with EV charging.

An electric car charging outside a hotel at night
A wall charger and an enclosure with a MID meter
What you get

A meter at every spot and charging without overload

✓

MID meter at every spot

See how many kWh each spot uses and what that costs at the rate on your electricity bill.

✓

Load management

When the kitchen and air conditioning run at full power, the chargers temporarily reduce their output, and the rest of the hotel runs normally.

✓

Guests only or open to all

The wallbox works with a card that guests get at reception, or it’s open to anyone who parks.

✓

Statements and service with a subscription

A monthly per-spot statement in PDF and CSV, a reply within 48 hours, priority service and an annual check of the installation and equipment.

✓

Vacation rentals and villas

For 1–2 spots next to an existing distribution board, you pay the kit price: 104.000 RSD for an 11 kW wallbox with a MID meter or 39.000 RSD for a reinforced socket, incl. VAT and basic installation. A longer cable to the spot is priced at the site assessment.

✓

Outdoor parking

The charger stands on a pedestal next to the spot. Excavation and asphalt work are not included in the price.

Pricing

Price per spot and shared infrastructure

Each spot costs the same as a kit. For more spots or a distant distribution board, shared infrastructure is added: a sub-panel with load management, the cable route, as-built documentation and an installation check.

Spot with 11 kW wallbox and MID meter
104.000 RSD
incl. VAT, basic installation next to the distribution board: up to 2 m of cable, RCD protection and breaker
Shared infrastructure
depends on the property
estimate in the calculator, exact price after the site assessment
Subscription per spot
990 RSD per month
incl. VAT, optional; first 2 months 0 RSD, no contract lock-in
Hotel, 4 wallbox spots in the garage, distribution board 10–30 m away
4 × 11 kW wallbox with MID meter: 416.000 RSD
Shared infrastructure: 240.000–456.000 RSD
About 164.000–218.000 RSD per spot
Optional subscription: 3.960 RSD per month for 4 spots
Total: about 656.000–872.000 RSD incl. VAT
Vacation rental or small hotel, 2 spots next to the distribution board
2 × 11 kW wallbox with MID meter: 208.000 RSD
Distribution board within 10 m of the spots, no sub-panel
Total: about 220.000–244.000 RSD incl. VAT
Hotel, 6 spots in an outdoor parking lot, distribution board 10–30 m away
6 × 11 kW wallbox on pedestals
Excluding excavation and asphalt work
Total: about 1.079.000–1.350.000 RSD incl. VAT
Not included
  • Power increase or new grid connection: you pay EDS, the grid operator, per its price list; you file the request, and we list the cost in the quote as a separate line item with no markup, so you know the total
  • Excavation and asphalt work outside the building
  • Fees of the authorities, where required — the property owner files the application; we provide the technical description of the works
  • Repairs to the existing wiring, if the site assessment finds it faulty
Process

How we work

01

Inquiry

Send us the number of spots, your city and where guests park. We’ll get back to you within 48 hours.

02

Consultation and rough estimate

Based on photos of the distribution board and the parking area, plus an electricity bill, we give you an estimated price.

03

On-site assessment

We check the distribution board, the approved power and the route to the parking spot. The assessment costs 2.990 RSD and is credited toward the installation.

04

Quote with exact price and timeline

The quote also covers how to charge guests. If a power increase is needed, you file the request with EDS, and we list the cost as a separate line item.

05

Installation and statements

Licensed electricians do the installation and hand over the documentation of the completed work. With a subscription, a per-spot statement arrives every month.

Questions

FAQ

Is 11 kW enough?

For guests who stay the night, 11 kW is enough: a wallbox fills even an empty battery overnight.

Do we need a fast (DC) charger?

Not if your guests stay overnight. A DC charger is a separate project with a new grid connection and makes sense where cars stop only briefly; pricing is available on request.

How do we bill guests for charging?

Charging can be a service at no extra charge, part of the parking or room rate, or a separate item on the bill. We agree on how guests pay as part of the quote.

Who pays for the electricity, and how much?

You do, on your own bill, because the chargers are on the hotel’s grid connection. We don’t sell electricity: the MID meter measures consumption per spot, so you calculate the charging cost at the rate on your own bill.

What if the hotel doesn’t have enough power?

Load management often makes it possible to work with the existing grid connection. If an increase is needed after all, you file the request with EDS, the grid operator, and pay per its price list; we list the cost in the quote as a separate line item with no markup, so you know the total.

How long does installation take?

We install one spot in one working day, and the deadline for the whole job goes into the quote. Under the current rulebook on special types of works (Official Gazette RS 87/2023 and amendments), installing chargers requires a decision approving the works under Art. 145 of the Law on Planning and Construction. At the assessment we tell you exactly what applies to your property; we provide the technical description of the works and the as-built documentation, and the property owner obtains the approval, if one is needed.

Inquiry

Request a quote

Leave your contact details and a few words about the property — we’ll get back to you within 48 hours with a rough estimate and a proposal for an on-site assessment.

Enter your name.
Check the number — e.g. +381 60 123 45 67.
Enter your city.
Without your consent we can't contact you.
Send request
No spam and no selling of data — we only get in touch about your request.
Thanks! Your request is in — we'll reply within 48h.
Something went wrong. Please try again — or write to us at hello@evolako.com.
Message us wherever suits you
hello@evolako.comCopy addressCopied ✓

💬 +381 65 381 6083 · messages only, no calls

🕗 Every day · reply within 48h

🌍 We speak Serbian, English and Russian.

Where we work: Belgrade and surroundings · Novi Sad · Vojvodina. For properties in other cities, leave your contact details — we agree case by case.

Home charging for apartment residents — installation, MID meter and billing down to the dinar.

The iPhone and Android app is coming soon.
Let me know when it’s out →

Follow us
hello@evolako.comCopy addressCopied ✓