For businesses · Garages and parking lots

Chargers for parking garages and parking lots

We install a charger with a MID-certified meter at every spot, so you bill each user only for the electricity they used, with no markup. Load management spreads the power of your existing grid connection across more spots.

A row of wall chargers in a business garage
MID meter
at every spot, billed by actual kWh
PDF and CSV
monthly statement per spot, with a subscription
39.000 RSD
a spot with a reinforced socket, incl. VAT
104.000 RSD
a spot with an 11 kW wallbox, incl. VAT
Parking spaces with two chargers and boxes for future chargers
What you get

A meter at every spot and more spots on the same grid connection

For garage and parking operators, office buildings, company parking lots and retail properties.

✓

MID meter at every spot

The meter measures kWh at every spot, and you pass the cost on to the user at the rate on your bill, with no markup.

✓

Load management

The chargers share the available power, so your existing grid connection can supply more spots.

✓

Spots prepared in advance

The cable route with junction boxes also runs past the spots you’ll equip later, and a charger is added from the box at the kit price.

✓

Monthly statement

With a subscription, you get a PDF and CSV every month with kWh and the amount per spot, for your accounting and for billing users.

✓

Card or open access

The wallbox works with a card you give to users, or it’s open to anyone who parks.

✓

Documents and inspection

The quote comes with a technical description of the works; licensed electricians do the installation and hand over the as-built documentation, and a licensed company checks the shared installation.

i
Rental garage

Rental garage: one spot for 39.000 RSD

If you rent out a garage, a tenant with an electric car only needs the START kit: a reinforced socket with a MID meter and basic installation next to the distribution board, 39.000 RSD incl. VAT. It delivers 2,3–3,7 kW, which gives up to about 180 km overnight.

You get documentation of the completed work, and the meter shows how much the tenant has used, so you bill the electricity together with the rent, with no markup. The whole process takes 1–2 weeks.

Pricing

Price examples for garages and parking lots

Each spot costs the same as a kit. Shared infrastructure — a sub-panel with load management, the cable route, boxes, as-built documentation and an installation check — is priced per property.

Spot with 11 kW wallbox and MID meter
104.000 RSD
incl. VAT, basic installation next to the distribution board: up to 2 m of cable, RCD protection and breaker
Spot with reinforced socket and MID meter
39.000 RSD
incl. VAT; 2,3–3,7 kW, up to about 180 km overnight
Shared infrastructure
depends on the property
estimate in the calculator, exact price after the site assessment
Subscription per spot
990 RSD per month
incl. VAT, optional; first 2 months 0 RSD, no contract lock-in
Garage or parking lot, 10 wallbox spots, distribution board 30–60 m away
10 × 11 kW wallbox with MID meter: 1.040.000 RSD
Shared infrastructure: 418.000–833.000 RSD
About 145.000–188.000 RSD per spot
Optional subscription: 9.900 RSD per month for 10 spots
Total: about 1.458.000–1.873.000 RSD incl. VAT
Same, plus 20 more spots prepared for later
10 × 11 kW wallbox with MID meter: 1.040.000 RSD
Infrastructure with the cable route and junction boxes for 20 more spots: 808.000–1.193.000 RSD
Total: about 1.848.000–2.233.000 RSD incl. VAT
Rental garage, 1 spot next to the distribution board
START kit: reinforced socket and MID meter
Basic installation: up to 2 m of cable from the distribution board, RCD protection and breaker
Total: 39.000 RSD incl. VAT
Not included
  • Power increase or new grid connection: you pay EDS, the grid operator, per its price list; you file the request, and we list the cost in the quote as a separate line item with no markup, so you know the total
  • Excavation and asphalt work outside the building
  • Fees of the authorities, where required — the property owner files the application; we provide the technical description of the works
  • Repairs to the existing wiring, if the site assessment finds it faulty
Process

How we work

01

Inquiry

Send us the number of spots, your city and the type of property. We’ll get back to you within 48 hours.

02

Consultation and rough estimate

Based on photos of the distribution board and the garage, plus an electricity bill, we give you an estimated price.

03

On-site assessment

We check the distribution board, the approved power and the route, and suggest how many spots to prepare in advance. The assessment costs 2.990 RSD and is credited toward the installation.

04

Quote with exact price and timeline

The quote sets out how many spots get chargers and how many are prepared, how access works and how users pay.

05

Installation and statements

Licensed electricians do the installation and hand over the documentation of the completed work. With a subscription, a per-spot statement arrives every month.

Questions

FAQ

Do we need to increase the power of our grid connection?

Often not, because load management distributes the existing power across all the chargers. If an increase is needed after all, you file the request with EDS, the grid operator, and pay per its price list; we list the cost in the quote as a separate line item with no markup, so you know the total.

How is electricity split between users?

Each spot has its own MID meter, and with a subscription you get a per-spot statement every month. Based on it, you re-invoice each user for their own consumption.

How many spots should we prepare in advance?

One for each electric car you expect over the next few years; we suggest a number at the site assessment. A prepared spot has a cable route and a junction box, and the charger is added when a user asks for one.

Can charging be billed together with parking?

Charging can be included in the parking fee or rent, or billed separately by the MID meter. Novi Sad, for example, has set a price of 500 RSD per hour for parking and charging together at city parking lots with 11 kW chargers. We agree on the billing method in the quote.

Who maintains the chargers?

We do. The warranty is 2 years and applies without a subscription too; with a subscription, you get a reply within 48 hours, priority service and an annual check of the installation and equipment.

Do chargers need a permit?

Under the current rulebook on special types of works (Official Gazette RS 87/2023 and amendments), installing chargers requires a decision approving the works under Art. 145 of the Law on Planning and Construction. At the assessment we tell you exactly what applies to your property; we provide the technical description of the works and the as-built documentation, and the property owner obtains the approval, if one is needed.

Inquiry

Request a quote

Leave your contact details and a few words about the property — we’ll get back to you within 48 hours with a rough estimate and a proposal for an on-site assessment.

Enter your name.
Check the number — e.g. +381 60 123 45 67.
Enter your city.
Without your consent we can't contact you.
Send request
No spam and no selling of data — we only get in touch about your request.
Thanks! Your request is in — we'll reply within 48h.
Something went wrong. Please try again — or write to us at hello@evolako.com.
Message us wherever suits you
hello@evolako.comCopy addressCopied ✓

💬 +381 65 381 6083 · messages only, no calls

🕗 Every day · reply within 48h

🌍 We speak Serbian, English and Russian.

Where we work: Belgrade and surroundings · Novi Sad · Vojvodina. For properties in other cities, leave your contact details — we agree case by case.

Home charging for apartment residents — installation, MID meter and billing down to the dinar.

The iPhone and Android app is coming soon.
Let me know when it’s out →

Follow us
hello@evolako.comCopy addressCopied ✓