We install a charger with a MID-certified meter at every spot, so you bill each user only for the electricity they used, with no markup. Load management spreads the power of your existing grid connection across more spots.


For garage and parking operators, office buildings, company parking lots and retail properties.
The meter measures kWh at every spot, and you pass the cost on to the user at the rate on your bill, with no markup.
The chargers share the available power, so your existing grid connection can supply more spots.
The cable route with junction boxes also runs past the spots you’ll equip later, and a charger is added from the box at the kit price.
With a subscription, you get a PDF and CSV every month with kWh and the amount per spot, for your accounting and for billing users.
The wallbox works with a card you give to users, or it’s open to anyone who parks.
The quote comes with a technical description of the works; licensed electricians do the installation and hand over the as-built documentation, and a licensed company checks the shared installation.
If you rent out a garage, a tenant with an electric car only needs the START kit: a reinforced socket with a MID meter and basic installation next to the distribution board, 39.000 RSD incl. VAT. It delivers 2,3–3,7 kW, which gives up to about 180 km overnight.
You get documentation of the completed work, and the meter shows how much the tenant has used, so you bill the electricity together with the rent, with no markup. The whole process takes 1–2 weeks.
Each spot costs the same as a kit. Shared infrastructure — a sub-panel with load management, the cable route, boxes, as-built documentation and an installation check — is priced per property.
Send us the number of spots, your city and the type of property. We’ll get back to you within 48 hours.
Based on photos of the distribution board and the garage, plus an electricity bill, we give you an estimated price.
We check the distribution board, the approved power and the route, and suggest how many spots to prepare in advance. The assessment costs 2.990 RSD and is credited toward the installation.
The quote sets out how many spots get chargers and how many are prepared, how access works and how users pay.
Licensed electricians do the installation and hand over the documentation of the completed work. With a subscription, a per-spot statement arrives every month.





Often not, because load management distributes the existing power across all the chargers. If an increase is needed after all, you file the request with EDS, the grid operator, and pay per its price list; we list the cost in the quote as a separate line item with no markup, so you know the total.
Each spot has its own MID meter, and with a subscription you get a per-spot statement every month. Based on it, you re-invoice each user for their own consumption.
One for each electric car you expect over the next few years; we suggest a number at the site assessment. A prepared spot has a cable route and a junction box, and the charger is added when a user asks for one.
Charging can be included in the parking fee or rent, or billed separately by the MID meter. Novi Sad, for example, has set a price of 500 RSD per hour for parking and charging together at city parking lots with 11 kW chargers. We agree on the billing method in the quote.
We do. The warranty is 2 years and applies without a subscription too; with a subscription, you get a reply within 48 hours, priority service and an annual check of the installation and equipment.
Under the current rulebook on special types of works (Official Gazette RS 87/2023 and amendments), installing chargers requires a decision approving the works under Art. 145 of the Law on Planning and Construction. At the assessment we tell you exactly what applies to your property; we provide the technical description of the works and the as-built documentation, and the property owner obtains the approval, if one is needed.
Leave your contact details and a few words about the property — we’ll get back to you within 48 hours with a rough estimate and a proposal for an on-site assessment.
💬 +381 65 381 6083 · messages only, no calls
🕗 Every day · reply within 48h
🌍 We speak Serbian, English and Russian.
Where we work: Belgrade and surroundings · Novi Sad · Vojvodina. For properties in other cities, leave your contact details — we agree case by case.
Home charging for apartment residents — installation, MID meter and billing down to the dinar.
The iPhone and Android app is coming soon.